Service guide
Standby generators, transfer switches and surge protection in Toledo
Page date: November 16, 2026.
Safety first. If you see sparks, smell burning or a power line is down, stay away and call 911. Report downed lines and outages to Toledo Edison through FirstEnergy at 1-888-544-4877. If you smell gas, leave the house and call 911 and your gas utility from outside.
Backup power is about keeping the furnace, sump pump, refrigerator and medical equipment running when Toledo Edison's lines are down. Done properly, it is safe. Done wrong, it can kill a lineworker down the street. This page covers the options, the one connection rule that matters most, what Ohio's code says, surge protection, national costs and the City permit fee.
Why Toledo homeowners think about backup power
Toledo Edison has said its grid work in Lucas County was aimed at helping "prevent or minimize the length of service disruptions, particularly during severe weather." That 2020 to 2022 project covered more than 59,000 customers in parts of Toledo, Holland, Maumee and nearby areas and added 134 automated reclosing devices. (FirstEnergy news release, Aug. 15, 2022) This guide found no published outage-frequency figures for Toledo neighborhoods to cite.
FirstEnergy notes that customers on life support should have a contingency plan, such as battery backup, and that it cannot guarantee faster restoration for customers with medical needs. (FirstEnergy, Outages)
Portable or standby?
- Portable generators run on gasoline or propane, sit outdoors and power selected loads through heavy extension cords or through a transfer switch or inlet installed by an electrician.
- Standby generators are permanently installed outside, run on natural gas or propane, and start automatically through an automatic transfer switch.
Either one must be connected safely, and either one makes carbon monoxide.
The rule that matters most: no backfeeding
FirstEnergy is explicit: never connect a generator directly to a home's electrical system without a proper isolation device, which it describes as a switch that disconnects the house from the utility's lines while the generator runs, and the reverse. This applies to portable and stationary units. To have one installed, FirstEnergy says to contact a qualified electrician. Without it, a generator wired into the house "could start a fire and/or electrocute a service crew member working to restore your power." (FirstEnergy, Using Backup Generators)
FirstEnergy also warns never to plug a generator into a wall outlet to power house wiring, which it calls "backfeeding." It endangers utility workers and neighbors on the same circuit and bypasses built-in household protection. (FirstEnergy)
Running a generator safely
From FirstEnergy's guidance (FirstEnergy, Using Backup Generators):
- Run it outside, far from windows, doors and vents, never in a garage or other partly enclosed space, even with fans or open doors.
- Install carbon monoxide alarms throughout the house. CO cannot be seen, smelled or tasted.
- Run it on a dry surface and dry your hands before touching it.
- Use heavy-duty outdoor cords rated above the total wattage, with no cuts and all prongs intact.
- Store fuel outside living areas in labeled, non-glass safety containers, and let the generator cool at least two minutes before refueling. Never refuel a running portable unit.
- CO symptoms include headache, dizziness, nausea, fainting, shortness of breath and weakness. Get to fresh air and call 911. Do not go back to switch the generator off.
What Ohio's code says about standby systems
Ohio's residential electrical rule, which Toledo enforces through TMC 1301.02, includes a section on emergency and standby power. It requires standby systems to be installed under the code and NFPA 70, with performance, transfer, testing and maintenance complying with NFPA 110 (liquid- and gas-fueled systems) or NFPA 111 (battery systems). Stationary standby generator assemblies must be listed to UL 2200, and engine-driven units must meet NFPA 37. Gaseous fuel supply piping must comply with NFPA 37 and the code's fuel gas chapter. (Ohio rule 4101:8-34-01, Section 3402)
A gas-fueled standby unit can therefore involve both electrical work and fuel gas piping, which Toledo's fee schedule permits separately (below).
Surge protection: optional in Ohio
The 2023 National Electrical Code includes surge-protection provisions for dwelling services. Ohio amended them. In Ohio's residential version, sections 230.67(A), 215.18(A) and 225.42(A) apply "where provided": surge-protection devices are installed according to those sections when a surge device is part of the service or feeder. (Ohio rule 4101:8-34-01) So a whole-house surge protector is a homeowner's choice in Ohio, and when one is installed it has to meet the code.
Whole-house surge devices at the panel and plug-in surge strips do different jobs. Ask the contractor what a panel-mounted device protects and what it does not. This guide found no published national or Toledo price for whole-house surge protector installation to cite.
What it costs (national figures)
No Toledo-specific generator prices were found. Angi's 2026 national figures (Angi):
| Job | National range |
|---|---|
| Install a whole-house generator | $1,540 to $8,740 |
| Install a generator transfer switch | $400 to $2,500 |
| Transfer switches (project category) | $200 to $400 |
The two transfer switch figures come from different parts of the same Angi article and are shown as published. A manual interlock or inlet for a portable unit and an automatic switch for a standby unit are very different jobs, so ask for itemized prices.
Toledo permits and fees
The City requires permits for electrical work, and a hired contractor must obtain them. (City of Toledo, permit information) The Toledo Municipal Code sets these related fees (TMC 1307.04, 1307.07, 1307.13):
- Generators (AC and DC): $40 minimum or $0.30 per kW.
- Existing-dwelling electrical alteration: $60 base per unit; every electrical permit has a $75 minimum.
- Residential fuel gas piping: $75 for the first device valve plus $20 for each additional valve, under the separate pressure piping fee schedule.
- State surcharge: 1% on residential permits.
Related guides
Sources
Sources cited on this page.